FORESEENChange order protection for contractors Join the waitlist
How it works

Watch it check a real-looking job.

Pick a side of the table. Tap answers. See what it catches.

See it in action. Sample job.

The scope, as written
      Lines to add to the bid
      • None yet
      RFI list (questions to send)
      • None yet

      Don't know? Tap "I don't know." It never guesses. The question goes on your RFI list, and the answer comes back to the same scope line.

      Sample jobs and dollar figures are examples, not quotes. The rules behind them are real, like EPA's lead rule for pre-1978 homes and the electrical code's GFCI rule.

      How the check works

      Five layers, so one miss doesn't slip through.

      Like a preflight: the pilot reads the gauges, the checklist makes sure no step gets skipped.

      1. Reads each photoOur technology
      "Seen in photo 2: panel, every slot full. Could need an upgrade."
      2. Reads the scope like an estimatorOur technology
      Each gap gets a risk, a question to ask and a line to add.
      3. Runs every trade checkFixed rules
      60+ checks run behind the scenes. You only see the ones that apply.
      4. Safety net adds back skipsFixed rules
      If step 2 skips a high-risk item or an unknown, it goes back on the list.
      5. You mark right or wrongYou
      A reported miss becomes a new check for everyone.

      Nothing catches everything. It says "could" when it can't see, shows which trades it didn't check, and never gives an all-clear.

      ??? ABOVE CEILINGIN THE WALLUNDER FLOOR
      What nobody can know yet

      Unknowns get named now, not argued later.

      ExclusionSomeone else's cost. Asbestos, mold.
      AllowanceA set budget. Code upgrades.
      Unit pricePer foot or item. Subfloor repair.

      Each one says who decides and how it's priced if found.

      Behind the wall

      Photos show what's behind the wall.

      Site walk→Photos checked→Scope written→Bid→Build
      Panel
      Old panel, every slot full.Could need an upgrade.+ Verify panel capacity.
      Ceiling
      Stained ceiling tiles.Could be a leak or mold above.+ Hidden water damage is extra.
      Floor
      Old 9-inch floor tile.Could contain asbestos.+ Owner tests before demo.
      Wall
      Cracked stucco at the mount.Could be too weak to hold.+ Confirm mounting surface.

      Examples. Each clue becomes a scope line. It reports only what it sees and says "could" for the rest.

      Can't see it at all? It still goes in the scope. ↓

      Gets smarter

      Miss it once. Check for it forever.

      Like an estimator who learns from every change order, but the lesson goes to everyone.

      It won't catch everything on day one. It's built so the list keeps growing.

      1Check a scope 2Tap rightor wrong 3Report a miss 4New check
      For PMs and supers

      On a live job, every ask gets checked against what you priced.

      Anything anyone says gets checked against what you priced. Subtle asks included.

      Planned: connect Zoom so calls on the job land here on their own. Today, paste or upload the transcript.

      Save a founding spot. 50% off for 6 months.

      Join the waitlist