Dave, owner of a remodel GC.Kitchen remodel, 1950s house.
DemolitionFramingElectricalPlumbingDrywallCabinetsTile
- Site walk. Junior estimator Maria follows the shot list: panel, sink base, ceiling stain, textured ceiling.
- In the truck. She pastes her scope and taps the trades on this job.
- Results. Full panel becomes an electrical allowance. Textured ceiling: asbestos test by owner. Stain: rot priced per foot.
- Between trades. No one patches after rough-in. No dumpster.
- Owner review. Dave hides 3 items his standard terms cover, adds 2 allowances and sends the bid.
- Mid-job. Rot shows up. It was priced per foot, so the change order is signed the same day.
Priya, property manager, 3 buildings.Suite 410 tenant turnover.
DemolitionDrywall and ceilingsElectricalHVACFire sprinklerFlooringDoors
- Tenant moves out. She walks the suite with the shot list: ceiling stains, panel, restroom, old floor tile.
- Scope in. She pastes the architect's 14-line scope and picks "Owner."
- Results. No asbestos survey, sprinkler moves with no drawings, "patch as needed," no accessibility upgrades.
- Bid package. She copies the "Bidder to price" lines and the unknowns into the package for 3 GCs.
- Bids back. All three priced the same lines, so they compare apples to apples.
- Mid-job. The stain is a roof leak. The unit price was agreed, so it's one line, not a fight.
Luis, estimator at a 22-person electrical shop.Office build-out bid.
ElectricalPlus what touches it: HVAC, fire alarm, low voltage
- Bid invite. 140 pages, due in 6 days, one site walk.
- Site walk. Luis shoots the panel, the ceiling space and the rooftop units.
- Scope in. He uploads the GC's electrical scope PDF and picks Electrical.
- Results. Fire alarm has no owner. Panel is full (photo 2). Unit wiring has no "by others."
- Proposal. He copies the exclusions and clarifications in, and sends 3 questions to the GC.
- Addendum. The GC fixes the scope. His bid stays tight, and the panel is an allowance, not a $14,000 fight.
Sam, project manager at a commercial GC.Office tenant improvement, week 3 of 10.
SuperCrewTenantArchitectOwner's rep
- Kickoff. The bid scope is loaded. Every line has a number.
- Week 3. The super sends a voice note: "Tenant wants two more outlets in the break room." Matched to line 4.2. Marked possible change.
- Site meeting. Sam uploads the call notes. "While you're at it, glass in that door?" Flagged: not in the scope.
- RFI answered. The architect confirms the ceiling height. The answer lands on line 6.1.
- Same day. Sam prices both changes and sends them to the owner's rep before the work starts.
- Closeout. No end-of-job fight. Every extra was signed before it was built.
Made-up people and jobs to show the flow.